TS Conductor Presentation - TBC

18 Nov 2026
Stage Four
Utilities face severe challenges: rapid load growth, grid congestion, long lead times, and massive interconnection queues TS Conductor offers a next-generation advanced conductor , AECC, featuring a pre-tensioned carbon fiber composite core, aluminum encapsulation, and fully annealed aluminum strands. It doubles or triples line capacity while using standard installation equipment. Reconductoring: Reduces costs by 30%–40% by eliminating structural retrofits. New Builds: Lowers overall CapEx by 10%–20% via longer spans and shorter towers. It provides a safe, robust, and cost-effective solution to maximize existing grid capacity.
Speakers
Joseph Hunter
Joseph Hunter, Vice President of Global Sales - TS Conductor